Document Category "Workshop 2020"

Back to Workshops Overview.

Title Authors Publication date
CEOS SAR WGCV 2020 Virtual Workshop - Programme V1.04 Chapman B.,Geudtner D.,Cote S. 6-Oct-20
Welcome to workshop and objectives for Session1 Chapman B.,Geudtner D. 6-Oct-20
Strawman requirements for deploying and maintaining SAR Cal/Val targets Muellerschoen R. 6-Oct-20
SAOCOM Calibration Targets Thibeault M. 6-Oct-20
RCM Calibration Targets Cote S. 6-Oct-20
Status Update for the Australian CR Array Thankappan M. 6-Oct-20
Status of Sentinel-1 Calibration Transponders Geudtner D. 6-Oct-20
Calibration targets for ALOS-series L-band SAR Takeshi Motohka 6-Oct-20
SAR Reference targets Reimann J.,Büchner A.M., Jirousek M., Raab S., Schmidt K., Weidenhaupt K., Schwerdt M. 6-Oct-20
DLR Geometric Calibration Targets Status Update and Ongoing Research Gisinger C., Balss U., Eineder M. 6-Oct-20
CARD4L Review Process and WGCV Role Thankappan M. 7-Oct-20
Polarimetric Radar (POL) Charbonneau F.,Lavalle M.,Zheng-Shu Zhou,Rosenqvist A.,CARD4L-SAR team 7-Oct-20
Sentinel-1 Space-to-Space RFI Experimental Results Ceba-Vega F.,Geudtner D.,Barat I. 8-Oct-20
Space2Space RFI - Orbital Considerations Barat I., Duesmann B. 8-Oct-20
ALOS-2 recent calval updates Takeshi Motohka 8-Oct-20
Space-to-Space RFI Affecting Sentinel-1: Identification and Investigation of Sources Hajduch G. 8-Oct-20
Operational monitoring of C-band RFI contamination for mitigation and new mission design Franceschi N. 8-Oct-20
Updates on PAZ System Juan Manuel Cuerda Muñoz 8-Oct-20
Calibration Aspects of KompSAT-5 Dochul Yang 8-Oct-20
Ground-based RFI in L-band imagery (PALSAR) Meyer F., Nicoll J., Doulgeris A.P. 8-Oct-20
TerraSAR-X-TanDEM-X Mission and System Status Bojarski A., Bachmann M., Schmidt K., Böer J., Wecklich C.,Klenk P., Schwerdt M. 8-Oct-20