CEOS SAR WGCV 2020 Virtual Workshop - Programme V1.04
|
Chapman B.,Geudtner D.,Cote S. |
6-Oct-20 |
Welcome to workshop and objectives for Session1
|
Chapman B.,Geudtner D. |
6-Oct-20 |
Strawman requirements for deploying and maintaining SAR Cal/Val targets
|
Muellerschoen R. |
6-Oct-20 |
SAOCOM Calibration Targets
|
Thibeault M. |
6-Oct-20 |
RCM Calibration Targets
|
Cote S. |
6-Oct-20 |
Status Update for the Australian CR Array
|
Thankappan M. |
6-Oct-20 |
Status of Sentinel-1 Calibration Transponders
|
Geudtner D. |
6-Oct-20 |
Calibration targets for ALOS-series L-band SAR
|
Takeshi Motohka |
6-Oct-20 |
SAR Reference targets
|
Reimann J.,Büchner A.M., Jirousek M., Raab S., Schmidt K., Weidenhaupt K., Schwerdt M. |
6-Oct-20 |
DLR Geometric Calibration Targets Status Update and Ongoing Research
|
Gisinger C., Balss U., Eineder M. |
6-Oct-20 |
CARD4L Review Process and WGCV Role
|
Thankappan M. |
7-Oct-20 |
Polarimetric Radar (POL)
|
Charbonneau F.,Lavalle M.,Zheng-Shu Zhou,Rosenqvist A.,CARD4L-SAR team |
7-Oct-20 |
Sentinel-1 Space-to-Space RFI Experimental Results
|
Ceba-Vega F.,Geudtner D.,Barat I. |
8-Oct-20 |
Space2Space RFI - Orbital Considerations
|
Barat I., Duesmann B. |
8-Oct-20 |
ALOS-2 recent calval updates
|
Takeshi Motohka |
8-Oct-20 |
Space-to-Space RFI Affecting Sentinel-1: Identification and Investigation of Sources
|
Hajduch G. |
8-Oct-20 |
Operational monitoring of C-band RFI contamination for mitigation and new mission design
|
Franceschi N. |
8-Oct-20 |
Updates on PAZ System
|
Juan Manuel Cuerda Muñoz |
8-Oct-20 |
Calibration Aspects of KompSAT-5
|
Dochul Yang |
8-Oct-20 |
Ground-based RFI in L-band imagery (PALSAR)
|
Meyer F., Nicoll J., Doulgeris A.P. |
8-Oct-20 |
TerraSAR-X-TanDEM-X Mission and System Status
|
Bojarski A., Bachmann M., Schmidt K., Böer J., Wecklich C.,Klenk P., Schwerdt M. |
8-Oct-20 |